皇冠体育(www.hg108.vip):Fukushima debris removal delayed by another year

频道:体育 日期: 浏览:7

皇冠体育www.hg108.vip)是一个开放皇冠正网即时比分、皇冠官方的平台。皇冠体育(www.hg108.vip)提供最新皇冠登录,皇冠体育包含新皇冠体育代理、会员APP,提供皇冠官网代理开户、皇冠官网会员开户业务。

Rafael Grossi (2nd right), director-general of the International Atomic Energy Agency, inspects the Fukushima Daiichi nuclear power plant’s decommissioning process at Okuma, Fukushima Prefecture, Japan, on May 19. – EPA pic, August 26, 2022.

WORK to remove nuclear debris from the devastated Fukushima power station in Japan has been delayed again to ensure the safety of the multi-decade project, plant operator Tepco said.

,

线上博彩平台排名www.99cx.vip)是一个开放皇冠体育网址代理APP下载、皇冠体育网址会员APP下载、皇冠体育网址线路APP下载、皇冠体育网址登录APP下载的官方平台。线上博彩平台排名上线上博彩平台排名会员登录线路、线上博彩平台排名代理网址更新最快。线上博彩平台排名开放皇冠官方会员注册、皇冠官方代理开户等业务。

,

Tokyo Electric Power Co (Tepco) had planned to begin extracting radioactive debris from one of the reactors this year – already later than the original 2021 start date.


转载说明:本文转载自Sunbet。

0 留言

评论

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。
验证码